Reimbursable Costs and Contract Disputes Cost-Reimbursement contract is a contract where a contractor is paid for all of its allowed expenses to a set limit, plus additional payment to allow for a profit. Cost-reimbursement contracts contrast with a fixed-price contract, in which the contractor is paid a negotiated amount regardless of incurred expenses. Federal agencies choose among three contract types to procure goods and services: Fixed-Price, Time-and-Materials and Cost-Reimbursement. Each contract type has a different level of cost or performance risk to the government. They can be used to motivate contractor’s efforts and discourage contractor inefficiency and waste.
The cost-reimbursement contract is considered high risk for the government because of the potential for cost escalation and because the government pays a contractor’s costs of performance regardless of whether the work is completed. The government uses the cost-reimbursement method only when it’s suitable when the cost of the work to be done cannot be estimated with sufficient accuracy to use any type of fixed-price contract.
It appears cost-reimbursement has issues that can be for or against the contractor such as the case with Boeing. Boeing Co is the US Air Forces biggest client. Boeing is suing the US Air Force for $385 million it says the US owes them for the Delta IV Rocket Launch services. Boeing, United Launch Alliance and Lockheed Martin Corp filed a joint compliant in June 2012. They feel they need to preserve their right to recover these costs. They feel these are legitimate allowable costs of the Delta IV program that Boeing incurred prior to the creation of United Launch Alliance. The suit goes back between the 90”s to 2006, when the Pentagon launched Evolved Expendable Launch Vehicle program. Boeing claims the Air Force had agreed to reimburse the costs at issue as…...

Similar Documents

Contract Disputes

...awarded a contract with the Naval Air Systems Command to remanufacture the Tomahawk Missile (Horan and Stanton, 2013). The contract was agreed upon by both parties however a case was brought before Federal Court to determine if a breach of the contract had occurred in light of new costs incurred. The Federal Court found in favor if Raytheon due to a statute of limitations clause in the Contract Disputes Act (Horan and Stanton, 2013). The Contract Disputes Act (CDA) was enacted to handle claims pertaining to contracts with the United States Federal Government. Notably for this paper the CDA includes a statute of limitations that allows for a claim to be brought against a party involved within six years of the finding of the discrepancy (Horan and Stanton, 2013). In the case of Raytheon, the Federal Government argued that the extra costs that Raytheon passed on to the Government were in breach of the original contract. Raytheon used a subcontractor to aid in the completion of the missile remanufacture, which was allowed under the contract, resulting in overhead costs that passed on to the Government. The primary issue resulting in the finding in favor of Raytheon was that the Federal Government filed its claim after the six year window under the CDA’s statute of limitations. The claim by the Government was that it was not aware of the subcontractors higher cost initially, and that only subsequent analysis of the situation uncovered the reason for the higher cost. The......

Words: 407 - Pages: 2

Mgmt 520 You Decide: Contract Dispute Group Discussion Week 4 - 11 Pages

...MGMT 520 You Decide: Contract Dispute Group Discussion Week 4 - 11 Pages IF You Want To Purchase A+ Work Then Click The Link Below , Instant Download http://hwnerd.com/MGMT-520-You-Decide-Contract-Dispute-Group-Discussion-Week-4-5321111.htm?categoryId=-1 If You Face Any Problem E- Mail Us At Contact.Hwnerd@Gmail.Com You Decide: Contract Dispute Group Discussion • Make sure you have a "group" topic showing this week. If not, e-mail your instructor ASAP. Review the You Decide Scenario. • Enter the group topic by no later than Wednesday to discuss the aspects of the scenario with your group. Your grade will be based on making at least six good, high-quality posts over at least three days to the topic and that reflects on the You Decide contract issues and that answers the questions posed at the beginning of the thread. Your instructor will NOT lead this thread—it will be up to the groups to run the thread. (Take this opportunity to get to know your classmates in your group!) You earn 75 points in this project, set up as follows: • (60 possible) Quality/quantity post points. You can earn up to 10 points for each high-quality post to the thread. A high-quality post will reflect on a learning tip from the You Decide project, provide significant factual background from the project that helps explain a learning point being made in the threads, pose an exceptional question that moves the group thread forward in a manner that creates more learning (while......

Words: 830 - Pages: 4

Mgmt 520 You Decide: Contract Dispute Group Discussion Week 4 – 11 Pages

...MGMT 520 YOU DECIDE: CONTRACT DISPUTE GROUP DISCUSSION WEEK 4 – 11 PAGES To buy this click here http://www.coursehomework.com/product/mgmt-520-you-decide-contract-dispute-group-discussion-week-4-11-pages/ Contact us:+1 315-750-4434 help@coursehomework.com MGMT 520 YOU DECIDE: CONTRACT DISPUTE GROUP DISCUSSION WEEK 4 - 11 PAGES You Decide: Contract Dispute Group Discussion Make sure you have a "group" topic showing this week. If not, e-mail your instructor ASAP. Review the You Decide Scenario. Enter the group topic by no later than Wednesday to discuss the aspects of the scenario with your group. Your grade will be based on making at least six good, high-quality posts over at least three days to the topic and that reflects on the You Decide contract issues and that answers the questions posed at the beginning of the thread. Your instructor will NOT lead this thread—it will be up to the groups to run the thread. (Take this opportunity to get to know your classmates in your group!) You earn 75 points in this project, set up as follows: (60 possible) Quality/quantity post points. You can earn up to 10 points for each high-quality post to the thread. A high-quality post will reflect on a learning tip from the You Decide project, provide significant factual background from the project that helps explain a learning point being made in the threads, pose an exceptional question that moves the group thread forward in a manner that creates more learning (while......

Words: 829 - Pages: 4

Proj 410 (Contract and Procurement )Complete Class

...PROJ 410 (Contract and Procurement )Complete Class Purchase here http://devrycourse.com/proj-410-contract-and-procurement-complete-class Product Description PROJ410 (Contract and Procurement )All Weeks Discussions , Case Studies, Midterm and Final Exams PROJ410 Final Exam Set 1 PROJ410 Final Exam Set 2 PROJ410 Week 4 Mid Term Exam PROJ 410 Selecting the Supplier Mid Term Exam PROJ410 Week 3 Case Study 1 BPO and Cloud Computing PROJ410 Week 5 Case Study 2 Do it Yourself Outsourcing PROJ410 Week 7 Case Study 3 What are the Cost Savings when a company outsources PROJ410 (Contracts and Procurement )All Weeks 1 To 7  Discussions PROJ410 (Contracts and Procurement )All Weeks 1 To 7  Discussions PROJ410 WEEK 1 DQ1 - Procurement in Projects PROJ410 WEEK 1 DQ2 - Contract vs Project Management PROJ410 WEEK 2 DQ1 - Contract Pricing Options PROJ410 WEEK 2 DQ2 - Project Control PROJ410 WEEK 3 DQ1 - RFP Requirements PROJ410 WEEK 3 DQ2 - RFP Evaluations PROJ410 WEEK 4 DQ1 - Evaluation Criteria PROJ410 WEEK 4 DQ2 - Bid Duration PROJ410 WEEK 5 DQ1 - Human Resource Transitioning PROJ410 WEEK 5 DQ2 - Globalization and Procurement PROJ410 WEEK 6 DQ1 - Contract Dispute Resolution PROJ410 WEEK 6 DQ2 - Benchmarking PROJ410 WEEK 7 DQ1 - Renegotiation and Termination PROJ410 WEEK 7 DQ2 - Contract Close PROJ410 Final Term Exam Set 1 Top of Form Page 1 1. (TCO 1 & 4) What would facilitate a business process outsourcing transition quickly and maintain......

Words: 3520 - Pages: 15

Mgmt 520 You Decide: Contract Dispute Group Discussion

...MGMT 520 You Decide: Contract Dispute Group Discussion IF You Want To Purchase A+ Work Then Click The Link Below , Instant Download http://acehomework.com/MGMT-520-You-Decide-Contract-Dispute-Group-Discussion-Week-4-66564345.htm?categoryId=-1 If You Face Any Problem E- Mail Us At JohnMate1122@gmail.com Week 4 - 11 Pages You Decide: Contract Dispute Group Discussion • Make sure you have a "group" topic showing this week. If not, e-mail your instructor ASAP. Review the You Decide Scenario. • Enter the group topic by no later than Wednesday to discuss the aspects of the scenario with your group. Your grade will be based on making at least six good, high-quality posts over at least three days to the topic and that reflects on the You Decide contract issues and that answers the questions posed at the beginning of the thread. Your instructor will NOT lead this thread—it will be up to the groups to run the thread. (Take this opportunity to get to know your classmates in your group!) You earn 75 points in this project, set up as follows: • (60 possible) Quality/quantity post points. You can earn up to 10 points for each high-quality post to the thread. A high-quality post will reflect on a learning tip from the You Decide project, provide significant factual background from the project that helps explain a learning point being made in the threads, pose an exceptional question that moves the group thread forward in a manner that creates more learning (while......

Words: 829 - Pages: 4

Proj 410 (Contract and Procurement )Complete Class

...PROJ 410 (Contract and Procurement )Complete Class Purchase here http://chosecourses.com/PROJ%20410/proj-410-contract-and-procurement-complete-class Product Description PROJ410 (Contract and Procurement )All Weeks Discussions , Case Studies, Midterm and Final Exams PROJ410 Final Exam Set 1 PROJ410 Final Exam Set 2 PROJ410 Week 4 Mid Term Exam PROJ 410 Selecting the Supplier Mid Term Exam PROJ410 Week 3 Case Study 1 BPO and Cloud Computing PROJ410 Week 5 Case Study 2 Do it Yourself Outsourcing PROJ410 Week 7 Case Study 3 What are the Cost Savings when a company outsources PROJ410 (Contracts and Procurement )All Weeks 1 To 7 Discussions PROJ410 (Contracts and Procurement )All Weeks 1 To 7 Discussions PROJ410 WEEK 1 DQ1 - Procurement in Projects PROJ410 WEEK 1 DQ2 - Contract vs Project Management PROJ410 WEEK 2 DQ1 - Contract Pricing Options PROJ410 WEEK 2 DQ2 - Project Control PROJ410 WEEK 3 DQ1 - RFP Requirements PROJ410 WEEK 3 DQ2 - RFP Evaluations PROJ410 WEEK 4 DQ1 - Evaluation Criteria PROJ410 WEEK 4 DQ2 - Bid Duration PROJ410 WEEK 5 DQ1 - Human Resource Transitioning PROJ410 WEEK 5 DQ2 - Globalization and Procurement PROJ410 WEEK 6 DQ1 - Contract Dispute Resolution PROJ410 WEEK 6 DQ2 - Benchmarking PROJ410 WEEK 7 DQ1 - Renegotiation and Termination PROJ410 WEEK 7 DQ2 - Contract Close PROJ410 Final Term Exam Set 1 Top of Form Page 1 1. (TCO 1 & 4) What would facilitate a......

Words: 7043 - Pages: 29

Mgmt 520 Week 4 You Decide Contract Dispute Group Discussion

...MGMT 520 Week 4 You Decide Contract Dispute Group Discussion Click Link Below To Buy: http://hwcampus.com/shop/mgmt-520/mgmt-520-week-4-you-decide-contract-dispute-group-discussion/ Or Visit www.hwcampus.com MGMT 520 Week 4 You Decide Contract Dispute Group Discussion , 32 Pages This group project covers a contract dispute situation. As a group, work through the following questions. Feel free to ask further questions in the thread of your group members, and answer your group members questions as well. The best work will be where all group members work together to get the questions answered. You will be graded on the quality of your posts, but points will be deducted if your answers are duplicates of your group members’. Take turns and build on posts. The questions below have more than one part within each of them so work through them together. Have fun with this! The main thing is that you learn from this exercise, along with creating some quality collaboration with your group. Read the Group Project under Course Home or the Assignments page for this week for the full grading rubric for this group project. Good luck!You are the manager of a large data processing project. Your company, Systems Inc., worked very hard to obtain a contract with Big Bank to do their conversions from their recent acquisition, Small Bank. The bank met with several companies to discuss who would do the best work on the contract. During your meeting with Big Bank, you told them......

Words: 329 - Pages: 2

Mgmt 520 Week 4 You Decide Contract Dispute Group Discussion

...MGMT 520 Week 4 You Decide Contract Dispute Group Discussion Click Link Below To Buy: http://hwcampus.com/shop/mgmt-520/mgmt-520-week-4-you-decide-contract-dispute-group-discussion/ Or Visit www.hwcampus.com MGMT 520 Week 4 You Decide Contract Dispute Group Discussion , 32 Pages This group project covers a contract dispute situation. As a group, work through the following questions. Feel free to ask further questions in the thread of your group members, and answer your group members questions as well. The best work will be where all group members work together to get the questions answered. You will be graded on the quality of your posts, but points will be deducted if your answers are duplicates of your group members’. Take turns and build on posts. The questions below have more than one part within each of them so work through them together. Have fun with this! The main thing is that you learn from this exercise, along with creating some quality collaboration with your group. Read the Group Project under Course Home or the Assignments page for this week for the full grading rubric for this group project. Good luck!You are the manager of a large data processing project. Your company, Systems Inc., worked very hard to obtain a contract with Big Bank to do their conversions from their recent acquisition, Small Bank. The bank met with several companies to discuss who would do the best work on the contract. During your meeting with Big Bank, you told them......

Words: 329 - Pages: 2

Mgmt 520 Week 4 You Decide Contract Dispute Group Discussion

...MGMT 520 Week 4 You Decide Contract Dispute Group Discussion Click Link Below To Buy: http://hwcampus.com/shop/mgmt-520/mgmt-520-week-4-you-decide-contract-dispute-group-discussion/ Or Visit www.hwcampus.com MGMT 520 Week 4 You Decide Contract Dispute Group Discussion , 32 Pages This group project covers a contract dispute situation. As a group, work through the following questions. Feel free to ask further questions in the thread of your group members, and answer your group members questions as well. The best work will be where all group members work together to get the questions answered. You will be graded on the quality of your posts, but points will be deducted if your answers are duplicates of your group members’. Take turns and build on posts. The questions below have more than one part within each of them so work through them together. Have fun with this! The main thing is that you learn from this exercise, along with creating some quality collaboration with your group. Read the Group Project under Course Home or the Assignments page for this week for the full grading rubric for this group project. Good luck!You are the manager of a large data processing project. Your company, Systems Inc., worked very hard to obtain a contract with Big Bank to do their conversions from their recent acquisition, Small Bank. The bank met with several companies to discuss who would do the best work on the contract. During your meeting with Big Bank, you told them......

Words: 329 - Pages: 2

Mgmt 520 You Decide: Contract Dispute Group Discussion Week 4 – 11 Pages

...MGMT 520 YOU DECIDE: CONTRACT DISPUTE GROUP DISCUSSION WEEK 4 – 11 PAGES To purchase this, Click here http://www.activitymode.com/product/mgmt-520-you-decide-contract-dispute-group-discussion-week-4-11-pages/ Contact us at: SUPPORT@ACTIVITYMODE.COM MGMT 520 YOU DECIDE: CONTRACT DISPUTE GROUP DISCUSSION WEEK 4 - 11 PAGES You Decide: Contract Dispute Group Discussion  Make sure you have a "group" topic showing this week. If not, e-mail your instructor ASAP. Review the You Decide Scenario.  Enter the group topic by no later than Wednesday to discuss the aspects of the scenario with your group. Your grade will be based on making at least six good, high-quality posts over at least three days to the topic and that reflects on the You Decide contract issues and that answers the questions posed at the beginning of the thread. Your instructor will NOT lead this thread—it will be up to the groups to run the thread. (Take this opportunity to get to know your classmates in your group!) You earn 75 points in this project, set up as follows:  (60 possible) Quality/quantity post points. You can earn up to 10 points for each high-quality post to the thread. A high-quality post will reflect on a learning tip from the You Decide project, provide significant factual background from the project that helps explain a learning point being made in the threads, pose an exceptional question that moves the group thread forward in a manner that creates more learning (while responding to......

Words: 1651 - Pages: 7

Mgmt 520 Week 4 You Decide Contract Dispute Group Discussion

...MGMT 520 Week 4 You Decide Contract Dispute Group Discussion Click Link Below To Buy: http://hwcampus.com/shop/mgmt-520/mgmt-520-week-4-you-decide-contract-dispute-group-discussion/ Or Visit www.hwcampus.com MGMT 520 Week 4 You Decide Contract Dispute Group Discussion , 32 Pages This group project covers a contract dispute situation. As a group, work through the following questions. Feel free to ask further questions in the thread of your group members, and answer your group members questions as well. The best work will be where all group members work together to get the questions answered. You will be graded on the quality of your posts, but points will be deducted if your answers are duplicates of your group members’. Take turns and build on posts. The questions below have more than one part within each of them so work through them together. Have fun with this! The main thing is that you learn from this exercise, along with creating some quality collaboration with your group. Read the Group Project under Course Home or the Assignments page for this week for the full grading rubric for this group project. Good luck!You are the manager of a large data processing project. Your company, Systems Inc., worked very hard to obtain a contract with Big Bank to do their conversions from their recent acquisition, Small Bank. The bank met with several companies to discuss who would do the best work on the contract. During your meeting with Big Bank, you told them......

Words: 329 - Pages: 2

Mgmt 520 Week 4 You Decide Contract Dispute Group Discussion

...MGMT 520 Week 4 You Decide Contract Dispute Group Discussion Click Link Below To Buy: http://hwcampus.com/shop/mgmt-520/mgmt-520-week-4-you-decide-contract-dispute-group-discussion/ Or Visit www.hwcampus.com MGMT 520 Week 4 You Decide Contract Dispute Group Discussion , 32 Pages This group project covers a contract dispute situation. As a group, work through the following questions. Feel free to ask further questions in the thread of your group members, and answer your group members questions as well. The best work will be where all group members work together to get the questions answered. You will be graded on the quality of your posts, but points will be deducted if your answers are duplicates of your group members’. Take turns and build on posts. The questions below have more than one part within each of them so work through them together. Have fun with this! The main thing is that you learn from this exercise, along with creating some quality collaboration with your group. Read the Group Project under Course Home or the Assignments page for this week for the full grading rubric for this group project. Good luck!You are the manager of a large data processing project. Your company, Systems Inc., worked very hard to obtain a contract with Big Bank to do their conversions from their recent acquisition, Small Bank. The bank met with several companies to discuss who would do the best work on the contract. During your meeting with Big Bank, you told them......

Words: 329 - Pages: 2

Mgmt 520 Week 4 You Decide Contract Dispute Group Discussion

...MGMT 520 Week 4 You Decide Contract Dispute Group Discussion To Buy This material Click below link http://www.uoptutors.com/mgmt-520/mgmt-520-week-4-you-decide-contract-dispute-group-discussion This group project covers a contract dispute situation. As a group, work through the following questions. Feel free to ask further questions in the thread of your group members, and answer your group members questions as well. The best work will be where all group members work together to get the questions answered. You will be graded on the quality of your posts, but points will be deducted if your answers are duplicates of your group members’. Take turns and build on posts. The questions below have more than one part within each of them so work through them together. Have fun with this! The main thing is that you learn from this exercise, along with creating some quality collaboration with your group. Read the Group Project under Course Home or the Assignments page for this week for the full grading rubric for this group project. Good luck!You are the manager of a large data processing project. Your company, Systems Inc., worked very hard to obtain a contract with Big Bank to do their conversions from their recent acquisition, Small Bank. The bank met with several companies to discuss who would do the best work on the contract. During your meeting with Big Bank, you told them that you had “never missed a conversion deadline.” At the time, your company had never missed a conversion...

Words: 321 - Pages: 2

Mgmt 520 Week 4 You Decide Contract Dispute Group Discussion

...MGMT 520 Week 4 You Decide Contract Dispute Group Discussion Click Link Below To Buy: http://hwcampus.com/shop/mgmt-520/mgmt-520-week-4-you-decide-contract-dispute-group-discussion/ Or Visit www.hwcampus.com MGMT 520 Week 4 You Decide Contract Dispute Group Discussion , 32 Pages This group project covers a contract dispute situation. As a group, work through the following questions. Feel free to ask further questions in the thread of your group members, and answer your group members questions as well. The best work will be where all group members work together to get the questions answered. You will be graded on the quality of your posts, but points will be deducted if your answers are duplicates of your group members’. Take turns and build on posts. The questions below have more than one part within each of them so work through them together. Have fun with this! The main thing is that you learn from this exercise, along with creating some quality collaboration with your group. Read the Group Project under Course Home or the Assignments page for this week for the full grading rubric for this group project. Good luck!You are the manager of a large data processing project. Your company, Systems Inc., worked very hard to obtain a contract with Big Bank to do their conversions from their recent acquisition, Small Bank. The bank met with several companies to discuss who would do the best work on the contract. During your meeting with Big Bank, you told them......

Words: 329 - Pages: 2

Big Bank vs Systems Inc Contract Dispute

...party to a contract is not given full or accurate information by the other party about the contract subject matter, misrepresentation occurs. In the case of misrepresentation in the formation of a contract, the law allows a rescission of the contract. Rescission means the contract is set aside. Misrepresentation occurs when a seller makes inaccurate statements about its product or fails to disclose pertinent information about its product that would affect someone’s decision to enter into the contract. To be a basis for rescission, the misrepresentation must have been one regarding a material fact. A material fact is the type of information that would affect someone’s decision to enter into the contract. Although misrepresentation can result simply because of inaccurate information, fraud is the knowing and intentional disclosure of false information or the knowing failure to disclose relevant information. Fraud has the same elements of proof as misrepresentation, with the added element of knowledge that the information given is false. Unconscionable Section 2c of Big Bank, Systems Inc. “In the event the conversion process is stopped, cancelled, or suspended by Big Bank, Big Bank agrees to pay Systems Inc. all labor costs, expenses, and charges incurred by Systems Inc. in preparing to perform under this Agreement” Some contracts are not actually contracts for criminal or illegal activities, but the terms of the contract are grossly unfair to one party. A contract that......